Every material from raw land to your front door — what it costs, what the code says, and when you'll need it. Check things off as you go; your progress saves itself.

13Construction Phases
200+Materials Tracked
ALL 50US Building Codes
SCROLL TO EXPLORE
// Select Your US Climate Zone (IECC)
// 02 — THE ROADMAP

BUILD PHASE BY PHASE

Every material, in the order you'll actually need it. Tap a phase to expand it. Check off materials as you research them.

SHOW ESTIMATED MATERIAL COSTS

No materials found for ''

01
PHASE 01 — REGULATORY

PERMITS & SITE PREP

Before a single shovel hits the ground, your local jurisdiction has to approve what you're building — and your lot has to be made safe for construction.

$1.3k–$8k0/8
Materials
At a Glance
Permit fee$500–$5,000+ (typ. ~$1,500)
Site prep materials$800–$3,000
Approval time4–12 weeks in most metros
Code standardIRC R105 — Permits
💡Texas, South Carolina & parts of Arizona have limited state codes — your county has the final say. Ask about setbacks, lot coverage & HOA rules before drawing plans.
02
PHASE 02 — EARTHWORK

EXCAVATION & GRADING

The lot is cut to grade, soil is removed for the foundation, and drainage is planned before any concrete is poured.

$2.1k–$7.7k0/8
Materials
*Recommended in all zones; required in EPA Zones 1 and 2 (includes cold regions: KS, CO, ND, SD, IA, PA, MN, WI, OH, WV, WY, MT, ID, WA, OR, northern CA).
At a Glance
Excavation$1,500–$6,000
Gravel base$400–$1,200
Radon rough-in$200–$500 now vs. $2,000+ later
Frost depth42" Chicago · 48" Minneapolis · 60" Fairbanks
Code standardIRC R401 — Footings & Foundations
💡Building on expansive clay (TX, OK, CO)? Over-excavate and replace with engineered fill — it's the cheapest slab-heave insurance you'll ever buy.
03
PHASE 03 — STRUCTURAL

FOOTINGS

Continuous concrete footings carry the entire weight of the house. They must be sized to the soil's bearing capacity and your local frost depth.

$3.0k–$8.0k0/10
Materials
At a Glance
Concrete$120–$150 / cu yd (needs 8–15 yds)
Rebar (#4)$0.40–$0.70 / lin ft
Total materials$3,000–$8,000
Min. strength2,500 PSI (most spec 3,000)
Footing width2× wall thickness — 16" for an 8" wall
Code standardIRC R403 — Footings
💡In cold zones (5+), a frost-protected shallow foundation lets you pour at just 12" deep with rigid foam — a Midwest favorite borrowed from Scandinavia.
04
PHASE 04 — STRUCTURAL

FOUNDATION WALLS & WATERPROOFING

The foundation transmits all structural loads to the footings and separates the living space from the earth. Type depends on your region and lot.

$4.0k–$30k0/17
Materials
OPTION A: POURED CONCRETE
OPTION B: CMU BLOCK
ALL FOUNDATIONS REQUIRE:
*IRC requires exterior R-10 to R-20 foundation insulation in Climate Zones 4 through 8.
At a Glance
Poured basement$15,000–$30,000
CMU block$10,000–$20,000
Crawlspace$6,000–$14,000
Slab-on-grade$4,000–$10,000
Waterproofing$2,000–$7,000
Code standardIRC R404 — Foundation Walls
💡The 2021 IRC now requires crawlspace encapsulation in most climates. In tornado & hurricane country, ICF walls beat wind codes for little extra cost.
05
PHASE 05 — STRUCTURAL

STRUCTURAL FRAMING

The skeleton of the house. Floor systems, load-bearing walls, interior partitions, and the roof structure — all built before any system is run inside the walls.

$25k–$57.5k0/22
Materials
FLOOR SYSTEM:
WALL SYSTEM:
*2×6 wall framing is required in Climate Zones 4–8 to accommodate high R-value insulation.
ROOF SYSTEM:
At a Glance
Lumber package$25,000–$55,000 (2,000 sq ft)
Engineered lumber+15–25% cost, less labor & waste
Storm hardware$800–$2,500 by zone
Code standardIRC R602 & R802 — Framing
💡A 2×4 is actually 1.5" × 3.5" — trips up every first-timer. Span tables differ by species (SYP, DFL, SPF), so your plans must name one.
06
PHASE 06 — ENVELOPE

ROOFING

The roof is the house's first line of defense. It goes on before anything else is exposed to weather — in the US, a house should be "dried in" within weeks of framing.

$4.1k–$20k0/13
Materials
*Self-adhesive membrane at eaves (and full deck in Climate Zones 6+) to prevent ice dam leakage.
At a Glance
Asphalt shingles$1.50–$3.50 / sq ft installed
Metal roof$5–$15 / sq ft
Tile roof$10–$25 / sq ft
Gutters$6–$12 / lin ft
Roof area2,200–2,800 sq ft on a 2,000 sq ft home
Code standardIRC R905 — Roof Coverings
💡Hurricane or hail country? Class 4 impact shingles can shave real money off homeowner's insurance. WUI fire zones (CA, OR, WA): Class A rated only — no wood shakes.
07
PHASE 07 — ENVELOPE

WINDOWS & EXTERIOR DOORS

Windows and doors are set in the rough openings during framing and sealed against the weather before rough-in work begins inside.

$4.2k–$24.5k0/10
Materials
At a Glance
Vinyl double-hung$200–$600 / unit
Fiberglass / wood$400–$1,500 / unit
Impact-rated$600–$2,500 / unit
Entry door$400–$2,000 · Garage $800–$2,500
Bedroom egress5.7 sq ft opening · max 44" sill
Code standardIRC R308 & R310 — Glazing & Egress
💡Read the NFRC sticker: low U-factor up north, low SHGC down south. Most homes need 15–30 windows — unit price adds up fast.
08
PHASE 08 — SYSTEMS

ROUGH-IN: PLUMBING, ELECTRICAL & HVAC

Three trades work in parallel inside the open walls before insulation and drywall close everything up. The order: HVAC rough-in → plumbing rough-in → electrical rough-in.

$15k–$38k0/43
Materials
*IECC requires R-8 insulated ductwork for any ducts running in unconditioned attics in Climate Zones 3–8.
At a Glance
Plumbing rough-in$3,000–$8,000
Electrical panel + wire$4,000–$10,000
HVAC$8,000–$20,000
Total MEP$15,000–$38,000
Code standardIRC P2603 · NEC 2020+ · ACCA Manual J/S
💡PEX-A home runs from a manifold mean fewer fittings and fewer leaks. AFCI breakers run $25–$45 each — pricey, but they stop fires before they start.
09
PHASE 09 — THERMAL

INSULATION

Insulation determines your home's energy efficiency for its entire life. The US uses climate zones 1–8 (IECC); your zone determines minimum R-values for every surface.

$2.5k–$15k0/13
Materials
ATTIC / CEILING:
*IECC requires R-49 in Zone 5, R-60 blown insulation in attic space in Zones 6, 7 and 8.
WALLS:
*Continuous exterior foam is required in Climate Zones 4–8 to minimize framing thermal bridging.
FLOOR / SLAB:
*Climate Zones 4–8 require R-10 under-slab insulation for hydronic or conditioned slabs.
AIR SEALING & VAPOR:
At a Glance
Fiberglass batts$0.60–$1.20 / sq ft
Blown cellulose$1.00–$1.80 / sq ft
Closed-cell foam$1.00–$2.50 / board ft
Total installed$8,000–$18,000
Blower door≤ 3 ACH50 (zones 3–8)
Code standardIECC R402 · IRC R316
💡Air-seal before you insulate — it's the biggest performance upgrade per dollar in the whole build. Find your zone at energycodes.gov.
10
PHASE 10 — INTERIOR

DRYWALL & INTERIOR WALLS

After all rough-in inspections pass, the walls close up. Drywall goes in, taped, mudded, and finished — transforming framing into rooms.

$2.2k–$7.5k0/13
Materials
At a Glance
Sheets (4×8)$12–$25 · needs ~240–290 sheets
Package (supply)$4,000–$8,000 — labor roughly doubles it
Garage wall1/2" Type X required
Code standardIRC R702 & R302.6
💡Texture is pure geography: smooth in the Northeast & PNW, orange peel out West, knockdown in the South. Nobody misses popcorn ceilings.
11
PHASE 11 — FINISH

INTERIOR FINISHES & FIXTURES

The final layer — the surfaces people will live with, touch, and see every day for decades. Flooring, trim, paint, cabinets, and fixtures.

$12k–$48.5k0/39
Materials
Flooring
Trim & Millwork
Paint
Kitchen & Bath
At a Glance
LVP flooring$3–$7 / sq ft installed
Hardwood$8–$15 / sq ft
Cabinets + counters$8,000–$22,000 (mid-range)
Interior doors$150–$500 / pre-hung
Paint package$3,000–$10,000
💡LVP quietly overtook hardwood as America's most-installed floor in 2022 — waterproof and basement-safe. CA, CO & the Northeast: stick to low- or zero-VOC paint.
12
PHASE 12 — EXTERIOR

EXTERIOR FINISHES & LANDSCAPING

The face of the house — siding, trim, and the immediate site work that makes the lot livable. These are the last materials before your Certificate of Occupancy.

$6.0k–$30k0/13
Materials
SIDING CLADDING:
SITE WORK & DETAILS:
*Prime all 6 sides of exterior wood trim before installation to protect against rotting.
At a Glance
Vinyl siding$3–$7 / sq ft installed
Fiber cement$6–$13 / sq ft
Brick veneer$12–$22 / sq ft
Stucco$7–$14 / sq ft
Final grade6" drop in first 10 ft
Code standardIRC R703 & R401.3
💡HardiePlank wants ring-shank nails, 1-1/4" from the edge minimum — nail it wrong and the warranty walks.
13
PHASE 13 — CLOSE-OUT (BONUS)

FINAL INSPECTIONS & MOVE-IN

Not a materials phase — a documentation phase. Your inspector walks every system; you get your Certificate of Occupancy; the house becomes a home.

$200–$1.5k0/14
Documents
At a Glance
Inspections + CO fee$100–$500
Blower door + HERS audit$300–$1,000
Energy Star targetHERS score ≤ 57
RequiredCertificate of Occupancy — everywhere
💡Most lenders won't close without the CO in hand. A HERS score under 55 can unlock "green mortgage" rates.
// 04 — KNOWLEDGE BASE

FREQUENTLY ASKED QUESTIONS

Common questions about construction scheduling, building code compliance, and using the roadmap.

The Materials Roadmap is an interactive reference guide detailing the 13 essential stages of building a home in the United States. It outlines all 202 materials needed—from survey stakes and site prep permits to shingles, siding, and final Certificate of Occupancy tests—to help owner-builders and homeowners understand the scheduling sequence, typical costs, and code rules.

Cost ranges are calculated based on national averages for standard builder-grade materials and typical subcontractor labor rates for a 2,000 sq ft home. Keep in mind that local labor availability, premium finish choices, complex structural engineering, and municipal fees can significantly influence your final building budget.

The guidelines are sourced from the International Residential Code (IRC) for structural and safety rules, the National Electrical Code (NEC) for wiring, and the International Energy Conservation Code (IECC) for thermal envelope standards. Always cross-reference these with your municipal building department's local amendments before purchasing materials.

Insulation (R-values), window glazing coefficients (SHGC/U-factor), slab depth, and venting rules depend heavily on local climate. By selecting your IECC Climate Zone using the filter tool above, the roadmap highlights components (such as specialized insulation sheets or vapor barrier wraps) specifically required for your region.

Yes. Any material you mark as "Researched" is automatically saved to your browser's local storage. You can click the "Save Progress" bookmark icon in the sticky dashboard to verify state saving, or click "Print Checklist" to generate a physical paper copy or PDF of your completed tasks.